Performing more since 1954
704.598.0818

Westvaco Slipline

PROJECT:

  • Sliplined 1,100 LF of 48″ steel process sewer with 40″and 42″ HOBAS pipe.
  • Project included bypassing of 25 MGD of high temperature effluent.
  • Rehabbed eight manholes with an epoxy liner.
  • Built 3 new flume structures for measuring flows.

LOCATION:

Charleston, South Carolina

Contact Us

  • This field is for validation purposes and should be left unchanged.