Performing more since 1954
704.598.0818

Corban Avenue Precast Tunnel

[SlideDeck2 id=398]

PROJECT:

  • Open cut Corban Ave. (Hwy. 73) to install 76’ of  9’ X 12’ tunnel, with heaviest section weighing 14 tons.
  • Also installed new sidewalk, curb and gutter and storm drain with catch basins.
  • Reopened Corban Avenue one week ahead of schedule.

LOCATION:

Concord, North Carolina

Contact Us

  • This field is for validation purposes and should be left unchanged.