Power

Chimney Foundation

[SlideDeck2 id=117]

PROJECT:

  • Foundation 15 feet thick spanning156 feet across an octagonal shape
  • Placed over 1,200 fourteen-inch square concrete piles
  • Installed 700 tons of rebar
  • 12,100 CY concrete placed using owner designated concrete batch plant supplier
  • Backfill over 14,000 CY
  • Turnkey project

LOCATION:

Cross, South Carolina

Turbine Rebuild

PROJECT:

  • In the mid 1990’s HALL saw the need to assist power generating companies with their maintenance of generators and turbines, and expanded our capabilities into this area.
  • HALL’s crews can completely disassemble and rebuild these finely tuned, precise components in a cost effective and expeditious manner.
  • HALL personnel has performed turnkey rebuilds on 4 each 30 MW units to date.

LOCATION:

Southeastern US

Floodgates Refurbishment

PROJECT:

  • Inspected and made necessary repairs and modifications as required to 4 flood gates for a major power company in the Southeast.
  • Work was accomplished by installing “stop logs” to create a temporary gate, upstream of the permanent floodgates, so that the latter could be inspected and repaired “in the dry”.

LOCATION:

Southeastern US

Nuclear Perimeter Security Modifications

PROJECT:

Site preparation, asphalt paving, concrete retaining walls, boulder placement and other site modifications for two separate nuclear facility’s security upgrades.

LOCATION:

Southeastern US

Bridgewater Hydro New Turbines Installed

[SlideDeck2 id=64]

PROJECT:

HALL’s crews assembled Units 1, 2 & 3’s Turbine Generators and installed two large diameter (110″) Inlet Valves. We provided all field machining for the project and final commisioning. Our crews had to overcome problems with various parts that were fabricated incorrectly, yet still maintain the overall project schedule for the owner.

LOCATION:

Lake James, NC