Bridgewater Hydro New Turbines Installed

[SlideDeck2 id=64]

PROJECT:

HALL’s crews assembled Units 1, 2 & 3’s Turbine Generators and installed two large diameter (110″) Inlet Valves. We provided all field machining for the project and final commisioning. Our crews had to overcome problems with various parts that were fabricated incorrectly, yet still maintain the overall project schedule for the owner.

LOCATION:

Lake James, NC