Performing more since 1954
704.598.0818

Alex Porter Dam

PROJECT:

Constructed a low risk dam for a private individual, including shaping the pond bottom.

Excavated approximately 6,800 cubic yards of material and constructed dam with approximately 14,800 cubic yards of clay.

Removed approximately 36,000 cubic yards of material during the pond shaping phase.

LOCATION:

Davidson, NC

Contact Us

  • This field is for validation purposes and should be left unchanged.